Fracturing Unit And Sand Blender Simulator

Description

Jereh fracturing unit & sand blender simulation system is self-developed based on the real job conditions. The simulator features online and single-unit operation simulation and dynamically displays the running situations of frac spread and key parts to help the operator deal with different operations.

  • 3D scenes and human interactive interfaces, equipment arrangement on site to be displayed though animation;

  • Designed with realistic sounds and real-time voice prompt;

  • Digital and gauge readout to monitor in real time;

  • User-friendly interface, software of reliable performance eliminates the possibility of system fault caused by misoperation;

  • System incorporates common job failures, alarm and operation instructions to help operators command frac operation and work process. 

  • Patented mathematical models perform simulation and calculation based on job design and actual working conditions;

  • Industrial PLC ensures stable system operation and high reliability.

Features

  • High Fidelity: The simulator designed with data model based on real job parameters with realistic sounds and real-time voice prompt to display the equipment structure, action and running status of various fluid medium providing the operator unique experience;

  • Safe & Economical: Operators are allowed for repeated practice without risking hazards or equipment damage in case real equipment is used;

  • Intelligent & Reliable: The simulator adopts industrial PLC and is designed with malfunction analysis, alarm and prompt function which help the operator react to the various failures rapidly.

 

 

 

Joint Operation

The fracturing unit & sand blender simulation system is capable of performing the following simulations:
Conventional fracturing operation of vertical well
Separate layer fracturing operation of vertical well
Ball-drop fracturing operation of vertical well
Abrasive jet fracturing operation of horizontal well
Stage fracturing operation of horizontal well
Staged multi-cluster fracturing operation of horizontal well
Equipment installation and removal operation
...
(Ports for development of more customized simulations reserved)

Specifications

Working Voltage 220V 50Hz AC
Rated Power 1,500W
Temperature -20℃~50℃
Display Resolution Single Screen/ Multiple Screens 1,920×1,080, 5,400×1,920, 3,840×1,080
Non-failure Operation Time ≥10,000 hours
Overall Dimensions 2,100×1,130×1,325 mm 

Related Parts

Inquiry